https://photos.app.goo.gl/uDKoT59dE5eeH1Lf6
2/4/2020
I've added some photos of the cleared slab. I hired a neighbor to do it and have regrets. He was supposed to separate out the road material; Hardi siding, ceramic fixtures, floor tile. He did not. He spread out a gravel pile; I can no longer use it for road repair. I failed to ask him to try to preserve the drain connections, both grey water and toilet water are embedded in the concrete; it will be a chore to try to reuse. They are unnecessarily broken and filled with debris. OTOH, there are separated piles of burnable stuff, steel, and other; I'll try to extract road material from the "other".
I put in three photos of the wiring project that Squatter Cy failed on. Now, very nearly complete.